Compare gummy manufacturing quotes by delivered, accepted bottle.
A low factory unit price can stop being the low-cost option after testing, freight, duty, brokerage, receiving and rejected units are included. Enter two suppliers' actual assumptions below; the calculator does not invent a tariff, fee, yield or price.
Your calculator entries and results are not sent to Sucotond or stored by this tool. If the calculator produces a result, privacy-limited measurement may record only that the tool was used; it contains no supplier name, price, quantity, rate, timeline, input or result. Use non-confidential commercial numbers only. Privacy notice.
Use the same unit, scope and destination for both suppliers.
Complete every applicable line. Enter 0 only when a cost is included or truly not applicable; leave an unknown amount blank so the result flags the missing assumption.
Production basis
Logistics and import
Acceptance and time
Quote A
Quote B
The calculator normalizes arithmetic; it does not decide which supplier is qualified or whether the assumptions are correct.
Separate arithmetic from qualification.
1. Normalize the manufacturing basis
Compare the same bottle count, gummy count, formula scope, package and release-testing scope. A bottle price is not comparable when one quote excludes setup, testing or packaging.
2. Add the delivery stack
Landed cost includes the product price plus applicable insurance, freight, tariffs, taxes and other fees. This tool leaves rates blank until you enter a broker- or authority-supported value.
3. Divide by accepted output
A rejected, held or unusable unit still consumed cash. The accepted-bottle view is a planning sensitivity—not a prediction of either supplier's performance.
Cost per accepted bottle = modeled total ÷ [quoted bottles × (1 − entered hold/reject/loss rate)]
When the cheaper bottle contains fewer servings
Two 60-count gummy bottles can represent different quantities of the finished product your customer will use. One proposed serving might contain two pieces, while another contains three. The bottle counts match; the number of servings does not.
Before comparing money, check that the proposals describe the same intended ingredient amounts per serving, relevant quality requirements, packaging scope and delivery destination. If those differ, label the comparison as two different product concepts. A lower cost per serving does not make two formulas technically equivalent.
Use three units in your quote review:
- The manufacturing price per quoted bottle.
- The modeled total cost per accepted bottle, including the stated delivery and acceptance assumptions.
- That accepted-bottle cost divided by the number of proposed servings in the bottle.
A fictional example you can check
This example continues the fictional 5,000-bottle magnesium concept in the RFQ preparation guide. Imagine two proposed replies: A retains two pieces per serving; B proposes three. These are teaching scenarios, not received supplier quotations. The brief's unresolved formulation questions still need review.
All amounts below are invented for arithmetic only. They are not Sucotond prices, market benchmarks or forecasts of supplier losses. For this example only, assume both concepts have already been reviewed against the same intended ingredient amounts per serving and agreed comparison scope.
| Input | Proposal A | Proposal B |
|---|---|---|
| Quoted bottles | 5,000 | 5,000 |
| Pieces per bottle | 60 | 60 |
| Pieces per proposed serving | 2 | 3 |
| Servings per bottle | 30 | 20 |
| Manufacturing price per quoted bottle | $4.80 | $4.20 |
| Manufacturing subtotal | $24,000 | $21,000 |
| Other modeled batch costs | $3,000 | $3,500 |
| Modeled total | $27,000 | $24,500 |
| Hypothetical unavailable-output assumption | 2% | 3% |
| Modeled accepted bottles | 4,900 | 4,850 |
| Cost per accepted bottle | $5.5102 | $5.0515 |
| Modeled accepted servings | 147,000 | 97,000 |
| Cost per accepted serving | $0.1837 | $0.2526 |
B is less expensive per quoted bottle and per modeled accepted bottle. A is less expensive per modeled accepted serving. Neither observation settles the supplier decision: the underlying product, quality evidence and commercial responsibilities still matter.
For this teaching scenario, the buyer pays the modeled batch total even though some output is permanently unavailable, with no replacement or refund. The other-cost line represents separate fictional transport and setup costs; it contains no extra charge for that unavailable output. These assumptions are not supplier terms, and the invented batch costs are not a rule that fees scale with order volume.
Calculate from unrounded inputs. Round only the displayed result:
Servings per bottle = pieces per bottle / pieces per serving
Accepted bottles = quoted bottles × (1 − unavailable-output fraction)
Accepted servings = accepted bottles × servings per bottle
Cost per accepted serving = modeled batch total / accepted servings
In this example, the unavailable-output assumption permanently excludes those bottles from the denominator. If a temporary hold will later be released, model its timing and costs separately rather than treating every held bottle as a permanent loss. Do not charge the same loss twice through both an extra cost line and a reduced denominator without explaining the treatment.
Copy this comparison worksheet
| Question | A: document or assumption | B: document or assumption | Comparable yet? |
|---|---|---|---|
| Same intended ingredient amounts and basis per serving? | Fill in | Fill in | Yes / unresolved |
| Same piece count and serving architecture? | Fill in | Fill in | Yes / explicit conversion |
| Same testing and release scope? | Fill in | Fill in | Yes / unresolved |
| Same bottle, closure, label and packing scope? | Fill in | Fill in | Yes / unresolved |
| Same delivery destination and included charges? | Fill in | Fill in | Yes / unresolved |
| Which outputs are unavailable, and why? | Fill in | Fill in | Documented / scenario only |
| Which fees occur once versus on every order? | Fill in | Fill in | Separated / unresolved |
Keep unknown charges marked unknown. Entering zero makes an assumption; it does not resolve a missing duty, testing, freight or setup line. Obtain the applicable basis from the relevant quotation or adviser instead of copying a rate from another product.
If the proposal does not explain unavailable output
Ask which quantity the buyer is paying for before applying a loss percentage:
Does the quoted quantity mean attempted output or accepted bottles to be delivered? What quantity and payment obligations apply if output is unavailable? State whether replacement, refund or a separate charge applies, and which costs already include that treatment.
If the quoted price covers 5,000 accepted bottles to be delivered and the supplier absorbs production losses, do not reduce that delivered-quantity denominator merely because production has a loss assumption. If the buyer instead pays for a batch with fewer accepted bottles and no replacement, use the documented accepted quantity and actual payment basis. A price that includes a yield allowance does not, by itself, tell you which case applies.
When the terms are missing, leave the accepted-output comparison unresolved or show clearly labeled scenarios. Do not assume zero loss, invent a typical percentage or apply the same contractual adjustment twice.
For a repeat-order comparison, remove only costs that the written scope confirms will not recur. Do not spread a one-time charge across a hypothetical order volume that you have not actually modeled.
Prepare a better purchasing conversation
Use the quote comparison calculator for its existing batch and accepted-bottle calculations, then apply the serving conversion shown here. Use the RFQ preparation guide to assemble one consistent product basis.
What this calculator does—and does not—establish.
Use it to expose missing assumptions
- Which party quotes freight and insurance?
- Who is the importer of record and who handles FSVP responsibilities?
- What customs classification, value and duty basis did the broker use?
- Are testing, inspection, storage and domestic delivery included?
- What event changes the quote after sample approval?
Do not treat it as a compliance determination
The calculator does not classify goods, set customs value, calculate an official tariff, determine importer or FSVP responsibilities, predict acceptance rate, verify a supplier or replace customs, regulatory, tax or legal advice.
Related decision: who the FSVP importer is.
Use the supplier qualification checklist and project evidence register for the non-price decision record.
Sources and scope: The U.S. International Trade Administration defines landed cost as the product price plus insurance, freight, tariffs, taxes and other fees. CBP explains that duty and user fees depend on the commodity, entry and transport mode. FDA states that dietary-supplement FSVP requirements vary with the imported product and circumstances. These sources define decision categories; they do not supply a product-specific rate or compliance conclusion for this calculator.
International Trade Administration: Determine Total Export Price · CBP: Duty, Taxes and Other Import Fees · FDA: FSVP Key Requirements
Send the same project basis to every supplier.
Share your category, formula direction, bottle count, testing scope, destination and delivery basis. Sucotond USA can return a scoped manufacturing proposal for comparison.
Start a Gummy Project Brief